Feasibility
Property, zoning, servicing and approval constraints reviewed before the unit strategy is fixed.
Multiplex design-build · GTA
Fordocon coordinates the design and construction of multiplex projects, from reviewing a property's potential to resolving individual homes within one building. We connect unit planning, approvals, structure, building systems and construction around the specific property.
Designed around the property
The first question is not simply the maximum number of units. A workable multiplex also depends on access, unit quality, servicing, structure, circulation, privacy and construction scope. The proposal needs to be tested against the property's current planning context and physical conditions.
Start with the address, existing drawings or survey, intended unit mix and investment range. Site-specific review is required before promising a unit count or approval route.
Project priorities
Property, zoning, servicing and approval constraints reviewed before the unit strategy is fixed.
Efficient homes planned around light, privacy, storage, circulation and practical daily use.
Structure, mechanical, electrical, fire-safety and acoustic requirements coordinated early.
Scope, sequencing and budget implications considered alongside the architectural design.
Integrated scope
Scope is tailored to the project, with design, approvals and construction planned together.
Decisions before construction
An existing-house conversion and a new multiplex begin with different constraints. Existing structure, ceiling heights, circulation and building services can influence a conversion. A new building introduces its own scope, sequencing and property considerations. Compare both options through feasibility and cost review where they are realistic alternatives.
Each unit should be considered alongside shared circulation, service routes and the building envelope. Daylight, storage, room relationships, acoustic separation and maintenance affect daily use. These decisions also influence construction, so they should be coordinated before details are treated as final.
The scope can include property review, feasibility, architectural design, consultant coordination, planning and permit submissions, preconstruction, procurement and construction. Approval and servicing requirements vary by property and municipality; project planning should reflect the actual review findings.

East York, Ontario · Completed 2026
Completed in 2026, the East York Multiplex brings four residential units together within one building. The project carried zoning review and permit drawings through construction, with light brick, wood-toned cladding and glass railings shaping the finished exterior.
Explore selected work led by the team behind Fordocon.
View the project galleryQuestions before starting
That requires a review of the specific property, applicable planning rules, building conditions and proposed design. A citywide headline does not establish the permitted or practical result for an individual site.
It may be an option, depending on the property and building. Feasibility should examine structure, circulation, unit layout, services and the required scope before committing to a conversion strategy.
No universal comparison is reliable. Existing conditions and the amount of alteration can change the scope substantially. Compare defined options with clear assumptions.
Engineering input should be coordinated when structural and building-system decisions affect feasibility and layout. Leaving those questions until the architecture is fixed can require redesign.
Send the address, available survey and plans, existing building information, intended unit mix, investment range and timing. Identify whether the property is owned or still being evaluated.
Begin with clarity
Share the address, existing conditions, intended unit count, budget and timing. We will help identify the approval path and next decisions.
Request a consultation